July 04
  • Production= 657,575 MWhr
  • Q3 Combined Average Equivalent Availability= 98.65%
       (2004 max target for Q3 is 95%)
  • Average Net Heat Rate= 7032 Btu/kWhr
  • Technical Availability= 99.94%
  • Combined Q1-Q2 Equivalent Availability= 88.8%
       (2004 max target for Q1-Q2-Q4 is 89.7%)

June 04
  • Production= 557,204 MWhr
  • Combined Average Equivalent Availability= 94.8%
  • Average Net Heat Rate= 7233 Btu/kWhr
  • Technical Availability= 100.3% Combined Q1-Q2
  • Equivalent Availability= 88.8%

May 04
  • Production= 306,128 MWhr
  • Combined Average Equivalent Availability= 46.9%
  • Average Net Heat Rate= 7067 Btu/kWhr
  • Technical Availability= 99.9%

April 04
  • Production= 604,937 MWhr
  • Combined Average Equivalent Availability= 99.6%
  • Average Net Heat Rate= 7167 Btu/kWhr
  • Technical Availability= 100.02%

Voice Mail Instructions

To Access Voice Mail:

Dial 333 from any phone in the Administrative Building (except the cordless phones) enter * 2#  twice

enter your password


September 03

For September, our (NERC) Equivalent Availability Factor improved to 88.8% and Net Capacity Factor adjusted up to 61.4%. The YTD Forced Outage Factor is recorded at 7.49%, due in no small part to Mother Nature, 230 Kv Breaker manufacturer errors, and our neighbors down the road. For the fourth consecutive month, Mesquite Generating Station Block 1 exceeded design Heat Rate with a seasonally adjusted Efficiency Rating of 103.9% at 7056 Heat Rate. Technical Availability was an impressive 99.4% and Commercial Availability reached an all-time high of 120.1%.


Rueters and Dow Articles

Reuters
Sempra starts rest of 1,250 MW Arizona powerplant

Wednesday November 12, 1:51 pm ET

SAN FRANCISCO, Nov 12 (Reuters) - Sempra Energy's power generation unit on Wednesday said the remaining 625 megawatts


RAS Operation

Effective immediately, we are now obligated to arm the RAS logic for the entire Facility when called upon by SRP. Please refer to the attached arming schedule. This schedule indicates