9.0 SYSTEM OPERATING PROCEDURES
     9.01 Combustion Turbine
     9.02 Boiler Steam    
     9.03 Steam Turbine System    
     9.04 Fuel Gas    
     9.05 HRSG    
     9.06 HRSG Feedwater    
     9.07 Condensate    
     9.08 Condenser Air Extraction    
     9.09 Site and Equipment Fire Protection    
     9.10 AC, DC, and Essential Services    
     9.11 Switchyard and High Voltage    
     9.12 High Voltage Transmission    
     9.13 DCS and Plant Control System    
     9.14 Closed Cycle Cooling    
     9.15 Cycle Makeup and Storage    
     9.16 Circulating Water    
     9.17 Well Water Supply    
     9.18 Service Water    
     9.19 Fresh Water    
     9.20 Compressed Air    
     9.21 Ammonia Supply and Storage    
     9.22 Ammonia Injection    
     9.23 Hydrogen / Carbon Dioxide    
     9.24 Nitrogen    
     9.25 Water Treatment, Sample and Analysis    
       
Table of Contents

*Sempra Energy Resources is not the same company as SDG&E/SoCalGas, the utilities.  Sempra Energy Resources is not regulated by the California Public Utilities Commission, and you do not have to buy Sempra Energy Resources products or services to continue to receive quality regulated service from the utilities.